Installation of central transport system

 

 

 

 

 

Contact Products

Central transport systems

In recent weeks we have installed a raw materials transport system with a machine platform for a Belgian customer. Below and next to the platform are the raw materials storage and on top of the platform are the dryers, pump units and communication system.

The two Vismec transport systems use two pump units, both of which use 1 spare pump, which automatically switches over in the event of maintenance or malfunction. The pumps are equipped with a double filter unit for extra capacity and no downtime during maintenance. The filter units consist of a cyclone filter with polyester filter equipped with a vacuum implosion for self-cleaning.

With an Industry 4.0 supervisor system, one can monitor all equipment, log data and set up equipment via computer, tablet or phone.

If you would like more information, please ask about the possibilities.

Contact one of our advisors

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna